🚚 Free Worldwide Shipping on All Orders!Shop Now
HomeStore

TLD Flowline MIPS Helmet - M/L - Point Infra Red

Product image 1
Product image 2
Product image 3
Product image 4

TLD Flowline MIPS Helmet - M/L - Point Infra Red

TLD Flowline MIPS Helmet - M/L - Point Infra Red

DETAILS

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, cool and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

SPECIFICATIONS

3-Way adjustable screwless visor

MIPS B-Series Rotational Impact Brain Protection System

Full 360-degree fit retention system with 3-way rear height adjustment

14 vents for maximum airflow

Full wrap in-mold construction

Extended Coverage MTB Trail Helmet

Side strap adjusters

$201.82
TLD Flowline MIPS Helmet - M/L - Point Infra Red—
$201.82

Product Information

Shipping & Returns

Description

DETAILS

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, cool and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

SPECIFICATIONS

3-Way adjustable screwless visor

MIPS B-Series Rotational Impact Brain Protection System

Full 360-degree fit retention system with 3-way rear height adjustment

14 vents for maximum airflow

Full wrap in-mold construction

Extended Coverage MTB Trail Helmet

Side strap adjusters

TLD Flowline MIPS Helmet - M/L - Point Infra Red | MTB Direct